post production - week 30
Post Production - Week 30 from mike ambs on Vimeo.
Yay. Today I finished logging the 1st scratch disk of Pedal's footage, which is 1,700+ individual video clips. I'm moving on now to the 2nd (and last) scratch disk, which has about 250 clips on it. After that there are a several hundred miscellaneous clips from personal cameras that Larry had while riding, and that Amanda and I had during filming. Not *all* of them needed to be tagged for the film, but most need to be looked at for the episodes.
Labels: Vlog, Weekly Update



newsletter sign up to get emails regarding important updates. (no spam ever.) 
donations
note: all post within 

<< take me back to the blog